Working Days in the Garden

English Lavender

English Lavender

Gorgeous weather meant work and play in the garden today.  My back is sure to rebel by morning, but for now it feels good to have put in a day’s work.

Lights and Ladders

One of the lights in the towering pine tree stopped working last summer. As we suspected, a small critter chewed through the wire and its housing. It’s hard to fathom the appeal of a few small, low-voltage wires, but there you have it. My husband rented a twenty-foot ladder and did the repairs.  I worried and paced the entire time. I held the ladder on his way up, then flipped the switch when instructed. Ten minutes crawl by when you’re busy worrying. I was happy to help him take the ladder back to the van. I’m glad that job is behind us.

Sod: Now you see it, now you don’t

I dug up a pie-shaped corner of sod along the sidewalk, creating a 3 x 4 foot area for flowers. After much deliberation and input from several readers, I decided to plant on the property side of the sidewalk, instead of using the sidewalk strip. I’m still plotting alternatives to the grassy strip, but for now I’ll stick to my ‘flower pie’ project.

It was heartening to see so many plump earthworms as I dug out the layer of grass. Worms are a welcome addition in any garden. I can’t wait to start planting.

Lavender: Shave and a Haircut

English Lavender growing along the deck was in desperate need of a haircut. I pruned away dead wood and undergrowth, then shaped the top along the deck.  It looks unkempt for now, but in a few weeks, new growth fill help fill it out. The lavender attracts bees all summer , something I always look forward to. I’m going to participate in the Great Sunflower Project this year, so I’m counting on lots of buzzing visitors.

There is suddenly so much to do as the weather improves and time seems to accelerate.  I wish I could slow things down and take time to savor it all. Ah, Spring!  I love you so. ♥